Plastic bucket making machine

18L/20L/5 gallon plastic paint bucket making injection machine.high speed with short cycle time, one hour make 140-150pcs bucket.

bucket machine
bucket making machine

The specifications are as follows:

– Imported advanced computer systems, Chinese, English, Russian, Spanish, French, Arabic interface. 

– Can save 100 sets of mould parameters.

– Advanced clamping structure and injection parts, precision hydraulic system and circuit design.

– Suitable for producing different types of precision small parts.

– A variety of text can be switched.
– Manual, semi-automatic and fully automatic mode.
– Automatic movement monitoring with alarm and fault diagnosis.
– Function of slope setting can set the start and stop of movements, so as ensure the smooth movement.

– Quality:12 month Quality guarantee ,Free spare parts replacement,(NOT include man-made sabotage) 

– Service:We provide free advanced training and maintenance in china factory,and 24 hours on-line or phone service if you request we also can provide installation and training abroad,until customer’s satisfaction 

– Delivery time: 60 days after advance payment 

paint bucket machine

1) LCD computer control with big display screen
2) Hydraulic double proportional valve
3) Hard chrome plated high tensile strength steel tie bars
4) Generous space for fitting large moulds
5) Large opening stroke
6) Two position transducers to control Clamping and Injection
7) Four stages of injecting, independent velocity and pressure control
8) Hydraulic mould height adjustment device
9) Screw cold-start prevention device
10) Melt decompression control
11) Screw back pressure control
12) Multiple hydraulic ejection
13) Differential high speed clamping
14) Centralized lubrication system
15) Low pressure mould protection device
16) Mechanical safety interlock
17) Double electrical safety interlock
18) Oil return filter
19) Oil tank with inner stainless steel container

bucket injection molding machine
paint bucket injection machine
bucket making machine

1.Installation, debug

After equipment reached the workshop of customer, place the equipment according to plane layout we offered.We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line.Time for installation and debug is 15-25 days.

2.Training

Our company offer technology training to customer.The content of training is structure and maintenance of equipment, control and operation of equipment.Training is in the workshop of customer.Seasoned technician will guide and establish training outline.After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.

3.Quality guarantee

We promise that our goods are all new and not used.They’re made of suitable material, adopt new design.The quality, specification and function all meet the demand of contract.We promise that the products of this line could storage for one year without adding any aseptic.

4.After sales

1,After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price.In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller’s demand, debug some failures.If you could not solve the problems, we will guide you by phone;If the problems are still can not solve, we will arrange technician to your factory solving the problems.The cost of technician arrangement you could see the cost treatment method of technician.
2,After quality guarantee, we offer technology support and after sales service.Offer wearing parts and other spare parts at favorable price;After quality guarantee, the technician of buyers should operate and maintain the equipment according to seller’s demand, debug some failures.If you could not solve the problems, we will guide you by phone;If the problems are still can not solve, we will arrange technician to your factory solving the problems.The cost of technician arrangement you could see the cost treatment method of technician.

Leave a Reply

Your email address will not be published. Required fields are marked *